Update OnGuard Assets with Hardware Import
The Reader, Input, and Output assets can be populated automatically in Designer based on the hardware currently connected to the system.
To use Hardware Sync:
- Ensure that the Communication Settings are configured with the correct information, and the project has been saved.
- Right-click on the OnGuard Integrated System in the Project Explorer and select Hardware Import.
- A confirmation pop-up will appear with information for which assets will be changed in the project. Select whether you want to delete assets that do not exist in the hardware, add assets missing from the project, or both. Click OK.